Preparing Works Before Self Drilling Anchor’s Construction
Time:2017-03-17From:sinorock View:
Before construction of self drilling anchor, there are several preparing works to be done:1. Master conditions of basic and underground pipelines in construction area.
2. Judge adverse effects from self drilling anchor construction to surrounding structures and pipelines. Relevant precaution measures should be planned, in advance.
3. Test self drilling anchor’s production craft, methods of tension and lock, equipment.
4. Identify grouting craft and grouting equipment.
5. Check raw materials’ variety, quality, model and inspection report.
Main construction equipment during process are drilling machine and grouting equipment. Before equipment entering construction site, they should be checked completely.
There are two kinds of professional people at construction site: technical operator and contributor. To guarantee their safety, all the design and operation works should be abided by the rules, especially at underground and closed space.
latest news
-
- Main Functions of Geotechnical Anchoring
- Time:2024-10-25From:This Site
- The fundamental principle of geotechnical anchoring is to transfer tension of structures
- View details
-
- Project management partnership picked for California high-speed rail
- Time:2024-10-22From:This Site
- The California High-Speed Rail project is a symbol of what’s possible when innovation, sustainability, and inclusivity come together.
- View details
-
- Application case analysis of SINOROCK self-drilling anchor--Huangshan Pedestrian Mall foundation support
- Time:2024-10-15From:This Site
- As an advanced construction technology, self-drilling hollow anchor bars are widely used in foundation support projects, effectively solving the construction problems of unstable rock masses such as strongly weathered rocks. The use of self-drilling anchor bolts not only overcomes the difficulty of drilling holes in the round gravel layer, but also gives full play to the advantages of it, improves construction efficiency, and reduces comprehensive construction costs.
- View details
-
- International Women's Day with Strawberry-picking
- Time:2024-03-09From:This Site
- Marked the annual observance of International Women's Day, and to commemorate this significant event, Sinorock organized a special strawberry-picking event exclusively for its female employees.
- View details
-
- Celebrate the 74th anniversary of the founding of the People's Republic of China
- Time:2023-10-01From:This Site
- On October 1st every year, we observe the annual National Day, commemorating the birth of our beloved motherland.
- View details
-
- Happy Mid-Autumn Festival!
- Time:2023-09-29From:This Site
- The Mid-Autumn Festival which also known as the Mooncake Festival. This annual festival falls on the fifteenth day of the eighth month of the lunar calendar and is called the Mid-Autumn Festival because it falls in the middle of the three months of autumn.
- View details
-
- SINOROCK to Attend EXPOMINA PERÚ 2024 in Lima, Peru
- Time:2024-08-10From:This Site
- Sinorock to Attend EXPOMINA PERÚ 2024 in Lima, Peru
- View details
-
- SINOROCK to Participate in MINING AND METALS CENTRAL ASIA 2024
- Time:2024-08-08From:This Site
- SINOROCK to Participate in MINING AND METALS CENTRAL ASIA 2024
- View details
-
- SINOROCK Gears Up for UGOL ROSSII & MINING 2024 with Custom Mining Solutions
- Time:2024-05-15From:This Site
- SINOROCK is thrilled to announce its participation in the highly anticipated 32nd International Trade Fair for Mining Technology, UGOL ROSSII & MINING 2024. The event will take place at the Exhibition complex "Kuzbass Fair" in Novokuznetsk, Kemerovo region - Kuzbass, Russia, from June 4th to 7th, 2024.
- View details