How To Support The Tunnel Pass Through Cobble Layer? Self-drilling Anchor Bolt Support Method
Time:2023-02-25From:sinorock View:
The rock strata that the tunnel traverses may encounter relatively complex geological conditions, and the pebble layer is one of them, which is characterized by broken rock and poor cohesive force. The support of the pebble layer needs to adopt the material of strong permeability and strong cohesion. The self-drilling anchor bolt can realize simultaneously drilling and grouting , which is more conducive to the bonding of broken rock formations and is convenient for construction. Next, we will give you detailed introduce of how to support the tunnel passing through the pebble layer.
Why has to support the tunnel in cobble layer?
The pebble stratum is loose, with little cohesion and large pores. Once excavated, it is easy to have a decrease in bearing capacity and poor resistance, and then some unexpected situations such as instability and disintegration. The reason why has to support the tunnel in cobble layer are as follows.
1. Loose Structure
The structure of the pebble layer itself is loose. If the tunnel is in an area close to river or sea,the fine particles will be eroded due to the immersion of groundwater, and the mechanical properties of the poorly cemented rock mass will be drastically reduced under the action of excavation.
2. Sudden Deformation
The pebble layer is very sensitive to excavation and other actions. Once the excavation is disturbed, the stress will be redistributed and the resistance will be reduced. The load-bearing arch of the tunnel will fail in a short time, causing instability, failure, disintegration, and then collapse into the tunnel.
3. The Tunnel face Cracked
The pebble layer includes pebbles, boulders, large-sized gravels, etc., and the mud-calcareous fillers will become weak, which will lead to further loosening and cracking of the face of the face. The phenomenon of block falling above the arch waist of the tunnel face will cause the deformation of the surrounding rock, break through the reserved deformation amount, and cause extrusion to the tunnel structure.
How To Support The Tunnel?
The geological structure of the tunnel is loose, and the rock mass is severely broken. It is difficult to form a hole with the general support construction method, resulting in a delay in the construction progress. The self-drilling anchor bolt integrates drilling, grouting and anchoring functions together, and can bond unstable rock formations well, so that the project can achieve the expected anchoring effect.
1. Drilling Preparation
The selection of angle, length, cement grout ratio, and drill bit should be determined according to the rock formation conditions. Most pipe roofing in tunnel will use self-drilling anchor bolts, with diameter of 51mm and 76mm. Adjust the drilling angle of the rock drill according to the terrain and geological conditions.
2. Drilling and Grouting
The drill bit should be put on the front end of the first anchor rod, and the tail end of rock bolt should be connected to the grouting machine through the rotary grouting adapter. Grouting is performed while drilling, and the grout is pressed into the hole and cracks of the rock mass to consolidate the rock mass, stay inside the deep stable rock mass, and bond together with the stable layer as the grout solidifies.
3. Coupling Anchor Rod
Stop drilling when 30 cm of the first anchor rod remains, put a coupler with artificially applied lubricant on the tail of the previous rock bolt, and then connect the next section of the bolt, and so on until drilling to the design length. At the end of the drilling, the anchor rod is exposed at least 10 cm, which is convenient for installing the arch backing plate and the nut.
4. Pull-out Test
After the self-drilling anchor is constructed, it is necessary to conduct a pull-out test on the self drilling anchor bolt system to check whether it meets the design value of the pull-out force. The test needs to randomly check no less than 3 bolts out of every 300 bolts in the operation area for pull-out force test to ensure that the construction effect meets the expected requirements.
Summarize
The above is the answer to the question of how to support the tunnel passing through the pebble layer. The quality of the support affects the safety of the tunnel construction. It is necessary to adopt support materials that are rich in successful support cases and verified by rich construction cases. Sinorock is a professional manufacturer of self-drilling bolts. As a leading expert in the ground support industry, the Sinorock team has many years of experience in providing complete geotechnical engineering services. If you have any needs or questions about self-drilling anchor bolt systems and their applications, please feel free to contact us at sinorock@sinorockco.com.
latest news
-
- 4 Functions of Pipe Roof Support of Tunnel Excavation
- Time:2023-11-17From:This Site
- This blog will introduce the function of the tunnel pipe roof method, and a new technique of tunnel construction development.
- View details
-
- Rock Bolt V.S. Soil Nail: What Are The Differences?
- Time:2023-11-15From:This Site
- Rock bolt and soil nail are very common materials in construction. However, the application and mechanism of them are very different. Read this blog to learn more details.
- View details
-
- 4 Methods of Tunnel Support: Ensuring Safety and Stability Underground
- Time:2023-11-10From:This Site
- Tunnel construction has been a critical aspect of infrastructure development worldwide. From transportation tunnels to underground mines, the need for robust support methods is paramount.
- View details
-
- Celebrate the 74th anniversary of the founding of the People's Republic of China
- Time:2023-10-01From:This Site
- On October 1st every year, we observe the annual National Day, commemorating the birth of our beloved motherland.
- View details
-
- Happy Mid-Autumn Festival!
- Time:2023-09-29From:This Site
- The Mid-Autumn Festival which also known as the Mooncake Festival. This annual festival falls on the fifteenth day of the eighth month of the lunar calendar and is called the Mid-Autumn Festival because it falls in the middle of the three months of autumn.
- View details
-
- Quality Control, the Vital Factor of A SDA Bolt Factory
- Time:2022-07-22From:This Site
- The self-drilling rock bolts are applied to support the tunnels, reinforce the foundations, and stabilize the slopes that are in bad conditions. The constructio
- View details
-
- Sinorock is gearing up for The Mining Show 2023 in Dubai!
- Time:2023-10-25From:This Site
- Sinorock is preparing for an exciting adventure at The Mining Show 2023 in Dubai! Come visit us at Booth J64 on November 21-22 to discover our exceptional mining solutions and immerse yourself in the cutting-edge developments of the industry.
- View details
-
- Sinorock Excited to Attend the 28th Mining Metals Central Asian 2023
- Time:2023-09-05From:This Site
- Sinorock Excited to Attend the 28th Central Asian International Mining Exploration & Mining Equipment Exhibition in Almaty, Kazakhstan
- View details
-
- Sinorock Set to Make a Splash at Mongolia Mining 2023 International Mining & Oil Expo
- Time:2023-09-05From:This Site
- Sinorock is gearing up to participate in the prestigious Mongolia Mining 2023 exhibition, slated to take place in Ulaanbaatar from October 3rd to 5th.
- View details